亚洲国产成人精品女人久久久,香蕉国产,国产伦精品一区二区三区妓女,欧产日产国产水蜜桃,国产一区二三区好的精华液,国产农村妇女精品一二区||www.nbqx56.cn,久久香蕉成人免费大片,亚洲国产成人久久一区久久,4399视频手机在线观看免费,国产精品亚洲综合色区,亚洲欧洲自拍偷线高清一区二区||www.crgt.net.cn ,亚洲Av无码一区二区三区在线播放_国产真实的和子乱拍在线观看_精品视频caoporm公开_久久久久久国产a免费观看||www.huaxiaboxin.com.cn ,精品少妇人妻av无码久久|国产成人亚洲精品青草天美|欧美久久AV免费无码久久木|视频一区中文字幕日韩专区|亚洲无线观看国产精品||www.xwul.cn

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1625

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://www.lejulejia.cn//


西畴县| 云霄县| 稻城县| 和林格尔县| 凌海市| 汝州市| 九寨沟县| 奎屯市| 龙门县| 长子县| 丹巴县| 天气| 怀柔区| 连山| 法库县| 黑河市| 时尚| 区。| 陵川县| 沾益县| 柳州市| 全椒县| 读书| 通化县| 西和县| 冷水江市| 邢台县| 青岛市| 镇安县| 东辽县| 庄河市| 武陟县| 班戈县| 玛沁县| 静安区| 宿松县| 崇义县| 卢龙县| 临汾市| 美姑县| 明星|